





CMU (concrete block) retaining walls are not framed house walls. Moisture drive, drainage, and movement differ — coatings that ignore that fail early.
Prep
We look at wall dampness, efflorescence, grade, and whether a breathable or drainage-aware approach is required before any finish goes on.
Process
- Clean and assess; address obvious moisture sources where feasible.
- Repair block and prior coating failures.
- Apply compatible base/finish for masonry conditions.
- Detail tops and ends so water is not trapped behind the coat.
Scope limits
We coat and finish walls that are appropriate for stucco/color coat work. Structural retaining-wall engineering is outside a finish-only scope — if the wall is moving or failing structurally, that comes first.